Uploads stay on this server — never emailed

Capabilities

Injection Molding

Melt, fill, pack, cool, eject. Bluesky Tooling cuts a tool when the geometry is ready to shoot — not when a CAD still moves every week. T1 means shots exist and a list is open. Production means that list is frozen. Aluminum or steel is a volume call. Uploads stay on this server.

  • T1 is a review — not a locked product
  • Aluminum or steel from the yearly number
  • Disk-only packs — never emailed
Injection-molded silver housing — original Bluesky Tooling visual Upload your design

All uploads stay on this server — never emailed

T1 shots vs locked production

Same resin. Two different jobs. T1 proves the cavity. Production repeats the frozen list. We will not treat first shots as a finished product.

T1 sample parts beside a proto insert — original visual

T1 shots + list

Steel or aluminum is cut. Parts come out. You get a dimension list and a photo pack. Budget a review. A CAD change after T1 is a cavity edit — priced, not shrugged.

First honest look. Not a lock. See also what T1 means.

Production steel mold with finished shots — original visual

Lock & repeat

You sign the list. We run against it. Color, resin lot, and SPI faces stay as written. Steel edits after lock are a new line — not “a small tweak.”

Yearly number sized the tool. See production tooling.

Single-cavity proto tool shots — original visual

Single-cavity proto

One cavity so you can hold resin parts before a family or multi-cavity spend. Faster steel talk. Shorter life. Honest when the shape will still move.

Bridge tool when you need shots, not a 100k-cycle die. Rapid tooling →

Aluminum tool vs steel tool

Pick from the yearly number and how often the cavity will change. Soft metal is faster. Hard steel lasts. We will not sell P20 for twenty pieces as theater.

Aluminum cavity block beside a steel mold half — original visual

Aluminum / soft tool

Faster cut. Easier steel-safe edits after T1. Fine for hundreds to a few thousand shots when the resin is not abrasive and the geometry is still learning.

First pick for a changing housing or a pilot lot.

Hardened steel production mold — original visual

Production steel

P20, H13, S136-class talk when you write wear, polish, or glass fill. Harder to recut. Quoted with a cycle band, not “forever.”

Honest when the yearly number pays for the hardness.

Tool halves for volume talk — original visual

Multi-cavity when volume pays

A second cavity is a second steel bill. Family tools only when the parts ship together and shrink the same. We will not pack unrelated parts into one shoe to look cheap.

Single cavity until the number is real.

Molding envelope we quote

Print wins. These are shop-talk numbers — not a brochure claim of ±0.05 mm on every clip.

What we cutSingle-cavity proto, bridge aluminum, production steel. Multi-cavity when the yearly number pays.
T1Shots + list. Geometry is not frozen until you lock. Steel edits are line items.
Resins we talkABS, PC, PC/ABS, PA (nylon, GF if written), POM / acetal, PP, HDPE, TPU / TPE. PEEK and other high-temp named when the print is real.
Volume talkTens to low thousands on a soft tool. Tens of thousands and up on steel. CNC or print until the tool pays.
Wall talkKeep walls even. Thick bosses sink. Ribs, not bricks. We mark sink and warp risk on the quote.
DraftWrite it. Texture wants more. Zero-draft show faces are a polish and eject conversation.
CosmeticSPI-style faces called on the cavity. Unmarked stay as-machined.
SecondaryThreaded inserts, laser mark, pad print, simple assembly — written, not assumed. Soft second shot is overmolding.
FilesSTEP + PDF — disk only

How injection molding works on this desk

  1. CAD inA solid plus a PDF. Resin, qty, color, SPI faces, yearly number. “Make it plastic” is not a spec.
  2. Cut the toolAluminum or steel from the volume. Side actions and inserts are quoted, not hidden in the piece price.
  3. T1Melt, fill, pack, cool, eject. You get shots and a list. Review. Steel-safe if we can; recut if you change the solid.
  4. Lock & repeatSigned list. Production against it. Color and lot stay as written.
Open steel mold and shots — original visual

Volumes we will actually tool

A tool is a capital line. We will say CNC or print if the yearly number cannot pay for steel.

Fit lots — no tool

Ten to fifty parts that still move. Machine the resin or print a shape. See plastic CNC and 3D printing.

Pilot / T1

Hundreds to a few thousand. Single-cavity aluminum or a short-life steel insert. You hold real resin before a multi-cavity spend.

Repeating production

Tens of thousands and up. Harder steel, more cavities if the math holds. Cycle band on the quote — not “unlimited life.”

Soft second shot

Grip, seal, or two-color. That is a second tool or a two-shot cell. Mention it here; price it on overmolding.

How to order molded parts

No account. Files stay on this server and open only in the staff inbox.

1

Get a factory quote

Upload the pack on Get a Quote. Nothing is mailed. Resin, qty, yearly number, and cosmetic faces on the PDF.

2

Start the tool

After you confirm. We will say if CNC, a soft tool, or production steel is the honest pick.

3

T1, then lock

Review the shots and the list. Lock, then we run. Packed to the quote address.

Why teams mold here

T1 is a review

We will not call first shots a finished product. Steel changes are priced. See the T1 note.

Honest aluminum vs steel

If twenty pieces are cheaper as CNC, the quote says machine. A new die is never “included.”

Named resins

ABS is not PC. PA+GF is not “nylon-ish.” Color and fill stay on the PDF.

Disk inbox

STEP and PDF land in uploads/quotes. Staff only. Never SMTP.

Resins we actually shoot

Name the grade and the fill. Mystery “engineering plastic” gets a question, not a silent swap. Glass and flame class change the tool and the sink talk.

ABS

Housings, covers, and clips that need a decent face. Easy to texture. Not a high-heat pick. Grade page →

PC / PC-ABS

Impact and a clearer window when you write it. Tougher on the tool than ABS. PC →

PA (nylon)

Gears, latches, under-hood-adjacent bits. Moisture and GF change shrink. Write PA6 / PA66 and the fill. Nylon →

POM / acetal

Low friction, snaps, and small gears. Watch thick-to-thin. Delrin →

PP / HDPE

Lids, living hinges, chemical-adjacent tubs. Living hinges want PP talk, not ABS.

TPU / TPE

Soft grips and seals — usually a second shot. See overmolding. Shore on the PDF.

ABSPCPC/ABSPA6 / PA66PA+GFPOMPPHDPETPUPEEK*

*PEEK and other high-temp resins when the print is real — not a default swap for ABS.

Resin chips and molded sample parts — original visual

Secondary: inserts, SPI, and a second shot

The cavity makes the shape. Hardware and polish are extra lines. Soft-over-hard is a different cell.

Threaded inserts

Heat-set or molded-in. Write metric or UN and the boss. A thin wall will not hold a brass insert — we will say so.

SPI-style faces

Call A / B / C / D on the show faces. Unmarked stay as-machined. Diamond polish is a steel and draft conversation, not a free gloss on the whole part.

Texture / VDI

A named grain if you have one. Texture wants draft. We will not guess a Mold-Tech number from a phone photo.

Mark & assemble

Laser, pad print, and a simple stack when written. Not a free kitting desk.

Overmold mention

TPU over PC, or a metal insert in the first shot. Bond and flash are balloons. Price that pack on overmolding.

Brass inserts in a molded housing — original visual

SPI faces we will actually polish

Write the family on the show face. Interior walls stay tool-finish unless you paid for them.

FamilyShop talkWhen we use it
A — diamondHigh gloss. Hard, polishable steel.Lenses, light pipes, a real show face.
B — paperSemi-gloss. Common cosmetic.Housings that should look finished, not mirrored.
C — stoneMatte. Hides flow a bit.Functional covers. Less fingerprint talk.
D — blastSatin to coarse.Grip, hide knit, or a cheap even look.
As-machinedCutter / EDM marks stay.Default insides. Write nothing → this.

Mold vs CNC vs print

All three can look like a housing. They are not interchangeable quotes.

SituationHonest pickNot this
Frozen plastic housing at volumeInjectionMachining every piece from plate
Ten fit parts, geometry still movingCNC plastic or printCutting steel you will recut next week
Soft second shot / gripOvermoldHoping paint feels like TPU
Metal insert in a plastic bodyInsert mold (call it)Pressing a nut into a thin boss later
Clear window + impactPC, namedClear-coating ABS and calling it a lens
One-off metal boxCNC millingA plastic tool for a steel job

Where molded parts show up

Molded industrial housing — original visual

Housings & covers

Two-shot clamshells, lids, and equipment skins. Snap and screw bosses written. Industrial-adjacent when the print is real — not a catalog claim.

Molded electronics enclosure — original visual

Electronics enclosures

Handheld cases, port cutouts, and internal ribs. PC or ABS as named. UL or flame class only if you wrote it.

Molded clips and retainers — original visual

Clips, retainers, fasteners

Cable ties that are not catalog, automotive-adjacent clips, and small acetal bits. POM or PA from the duty, not from a pretty photo.

DFM notes before you upload

Sink and warp are geometry, not luck. We will mark the risk. We will not promise a brick-thick logo on a 1.5 mm wall.

Even walls

Thick-to-thin is a sink mark and a warp. Core out bosses. Ribs about half the wall — not a solid chunk behind a show face.

Sinks

A fat logo, a tall boss, or a rib that matches the wall will read on the A-side. We will ask you to thin it or to hide that face.

Warpage

Long flat lids and one-sided glass fill pull. Add ribs, a crown, or a different gate. We will not “just pack harder” a banana.

Draft

Write it. Texture wants more. Zero draft on a deep box is an ejector and polish fight.

Undercuts

Side actions and lifters are steel. A pass-through core is cheaper than a slider if the print allows it.

Gates & ejectors

They leave a witness. Mark hide faces. We will not put a gate on a lens unless you drew it there.

Standards & inspection

We work to the band on your drawing. If you write nothing, we say which shop default we used — and we will still ask for a resin.

General talkISO 2768-style medium on plastics when you write the class. Steel-safe on criticals until T1 lock.
ThreadsInserts as a standard (metric or UN). Molded threads only if you drew them and accept the draft.
InspectionBalloons you marked on T1 and on the locked list. CMM / FAIR are line items.
CosmeticSPI or texture on show faces. Unmarked stay functional.
FilesDisk only — never emailed.

FAQ

The tool is cut and shots exist. You get a list. The product is not locked until you sign that list. Budget a review. Steel edits after T1 are quoted. More on the T1 resource.
Aluminum when the yearly number is small or the cavity will still move. Steel when wear, polish, or glass fill needs it. We pick from volume — not from a brochure photo of a hard die.
ABS, PC, PA, POM, PP, HDPE, TPU / TPE as named. PEEK when the print is real. Write fill, color, and flame class. We do not silent-swap.
Yes when you write the pair and the bond. Soft second shot is priced on the overmolding page. Brass inserts are a secondary line on this desk.
Uneven walls sink. Long flats and glass fill warp. We mark it on the quote. Rib, core, or change the gate — we will not promise a brick-thick logo stays invisible.
You own the steel you paid for. It stays on this floor for repeats unless you buy a crate. Shipping the shoe is a line item.
Machine until the yearly number pays for a cavity. A tool for twenty pieces is usually the wrong spend.
No. The pack lands in uploads/quotes and opens only in the admin inbox.

Send the molding pack

STEP plus a PDF. Resin, yearly number, and SPI faces. Files stay on the Bluesky Tooling server and open only in the staff inbox.

Get a Quote