Can you make it?
Send the solid. You get a manufacturability pass, not a price alone. Mill, turn, Swiss, stamp, extrusion, injection, or a tool — we pick from the print. If a feature cannot be held at the money you expect, we say so first.
Articles & answers
Factory answers from this desk — what to upload, which cell we actually program, what a silent drawing gets, how a date is set, and where the pack lives. Written against our homepage, CNC pages, stamp / extrusion / mold tools, materials, industries, and the quote form. We do not email drawing packs, and we do not need a customer account.
Four questions decide whether a pack becomes a job. Short answers here; the rest of the page is the detail this factory actually runs.
Send the solid. You get a manufacturability pass, not a price alone. Mill, turn, Swiss, stamp, extrusion, injection, or a tool — we pick from the print. If a feature cannot be held at the money you expect, we say so first.
The tightest balloon sets most of the number. Quantity amortizes setup; it does not erase toolpath or die steel. Ask 1 / 10 / 100, or tool-plus-part, if you want the break.
There is no catalog lead time. A next-business-day engineering look is typical — not a 24-hour cut promise. Hard dates belong on the form. Steel for a die or a cavity has its own clock.
Three inputs. Missing one comes back as a question instead of a number. The quote form is the inbox — not a mailbox attachment.
| 3D | STEP, STP, IGES, SLDPRT — preferred. STL for print / look only. |
|---|---|
| 2D | PDF (vector). DWG / DXF for laser flats and stamp blanks. |
| Other | DOCX notes, JPG/PNG references, ZIP of the set. |
| Limits | 25 MB each, 10 files. Disk only — not SMTP. |
Steps 1–3 stall only when the request is incomplete. A complete pack does not wait on a missing grade. Production does not start on a screenshot.
Model, qty, named grade, any hard date. Form on Get a Quote. Files land in the folder we watch.
A person flags cost drivers and picks the cell. No separate DFM product. No instant machine number.
Process, price, and timing for that part — not a rate card. Tool and part together when a die or cavity is honest.
The mill, lathe, press, or tool build starts after you agree. First article if you bought it.
Inspected to the balloons you bought. Packed to the quote address. Papers you purchased ride with the lot on disk.
| Engineering look | Most complete packs get a pass the next business day. Missing grade or balloon → a question, not silence. |
|---|---|
| CNC / sheet / print | Date is quoted per job. We do not publish a one-day cut promise. Capacity is matched to the named cell before we write a date. |
| Stamp die / extrusion orifice | Steel is a lead. Twenty pieces stay laser-plus-form or mill-from-plate. Hard tooling is a line when the yearly number pays. |
| Bridge or production tool | Cavity cut, then T1. T1 means shots exist and the list is open. Production timing starts after the list freezes. |
| Expedite | Flag the date in the project description. We quote the fastest route we can actually hold — not a slogan lane. |
More detail: How to order.
Geometry picks the machine. We will not mill a clip that wants a tool, or sell Swiss for a short fat collar. Sibling pages stay honest.
We do not publish a rate card. A rate card ages badly and never describes the part you have. Five of these are yours to set.
The single tightest balloon, not the average. Mark only what is functional. Fine on three features is a different quote than fine on every edge.
How many clamps the geometry forces. Share a datum. Mill-turn exists so a turned OD and a flat do not pay twice.
Grade, stock form, how much we hog. Say if a documented equivalent is OK. Certs are a buy, not a gift.
Setup amortizes. Ask three quantities before you freeze the batch. A die or cavity is quoted with the part so you can see the break.
Class and spec, not “looks anodized.” Film is thickness. Anodize is aluminum. Powder adds build. Passivate is stainless.
Every feature vs a sampling plan. Buy the paper you need. We do not hang a borrowed ISO / IATF / AS9100 plaque. Standards →
The pack is for quote and manufacture — not a public drop. Terms already say that. Sensitive geometry should wait for paper.
uploads/quotes/{id}/ on this host. Signed-in staff only. Never emailed. Never forwarded as an attachment.
Ask on the quote. Lot paper is much harder after the chips are gone. We will not invent a heat number, and we will not stamp a lab we did not use.
| Always | Packing list. Clean, protected, address on the quote. |
|---|---|
| On request | Mill / supplier cert, tensile MTR (metals), CoC, dimensional / CMM, FAI, RoHS / REACH for the named grade and finish. |
| Silent drawing | fH-style metals, mK-style plastics. We write which class we used. ISO 2768 → |
| CNC talk | ±0.05 mm general on milled faces. About ±0.005 mm only on a marked feature after review — a ceiling, not a default. |
| As-machined | Typically Ra 3.2 μm unless a face is marked. |
| Named QMS PDF | We do not advertise a borrowed SGS / ISO 9001 / IATF / AS9100 file. If you need a named clause, ask — we will say yes or no. |
| Ship | Packed to the address you wrote. Your carrier account if you say so before confirm. Terms agreed on the quote. |
Grouped the way buyers actually ask — quoting, files, dates, money, bands, shipping and NDA, then the cells, grades, and sectors this site already named. Answers match the factory we run, not a generic shop script.
What to send, who opens it, what you get back.
What opens, what is a look-only mesh, and the size limit on this host.
Dates we can actually keep — not a brochure floor dressed up as a promise.
What moves the number, and how money is agreed on this desk.
Print wins. Silent title block gets a stated default. Reports are line items.
Where the crate goes, who sees the solid, who owns the steel.
The processes and folders this site already named — not a list of every machine on earth.
No account. Files stay on this server and open only in the staff inbox.