Uploads stay on this server — never emailed

Articles & answers

How to Order

No customer account. You upload a pack; a Bluesky Tooling engineer opens it from disk and replies with process, price, and timing. That is the whole factory conversation — the same path as a manufacturing-resource “how it works” page, written for this desk. Files are never emailed.

  • Upload on Get a Quote
  • DFM look included
  • Production after you confirm
Engineer with CAD and drawing — original visual Upload your design

All uploads stay on this server — never emailed

Five steps from pack to parts

Steps 1–3 stall only when the request is incomplete. A complete pack does not wait on a missing grade.

1

Send the pack

STEP + PDF + qty + named grade. Hard date if you have one.

2

DFM review

We flag the features that cost more than they should. Process pick is honest.

3

Quote

Price at your quantity, with the lead for that part written on it.

4

Confirm

Cutting or tool build starts after you agree. FAI if you bought it.

5

Receive

Inspected to the balloons you bought. Packed to the quote address.

Build the pack once

A request with these three things gets a first-pass number. A screenshot gets a question.

SolidSTEP, IGES, or SolidWorks part. STL only for print / look.
DrawingPDF with material, finish, and the bands you will measure. DXF for flats.
QuantityOne number, or 1 / 10 / 100 if you want the break.
Grade6061-T6, 304, POM — not “metal.”
Limits25 MB each, 10 files, ZIP OK. Readable names.

Longer format table: FAQ — accepted files. DFM checklist: Design Guide.

Quote pack still life — original visual

What we review before we price

Process fit

Mill, turn, sheet, mold, cast, or print — picked from the geometry and the yearly number. We will not mill a clip that wants a tool.

Bands & threads

Silent title block gets our default. Fits and threads need pairs and classes. Standards →

Finish sequence

Coat after a fit is a different hole. Write the stack.

DFM mark-up on a drawing — original visual

What you can order on this desk

The manufacturing-resource list, written as cells we actually quote — not a catalog of every process on earth.

CNC

Mill, turn, mill-turn, Swiss, EDM. CNC →

Sheet

Laser, brake, stamp, waterjet. Sheet →

Mold & cast

Injection, T1 vs production, die cast. Molding →

Inspection papers

CoC, mill cert, CMM, FAI — bought on the quote. Standards →

After you confirm

  1. Same programFirst article and production share fixturing and the inspection list you bought.
  2. StatusLives in the staff inbox with the files. We do not run a public tracking portal as a slogan.
  3. PackClean, protected, address on the quote. Your courier account if you said so up front.
Packed inspected parts — original visual

FAQ

Use the form so the pack lands in the folder we watch. Email is not the inbox.
No. Name, email, phone, and the files. Staff open them in admin.
Engineering look: when the pack is complete. Production: after you confirm. FAI window: when we send the report.
See FAQ for files, price drivers, and papers.

Upload the pack

No account. Files stay on this server and open only in the staff inbox.

Get a Quote